oscar oscar

ANNUAL REPORT 2022/23

  • Preamble
    • Statement from the Directors
    • OSC at a Glance
    • Our Renewed Guiding Statements
    • Our Learning Model
    • Our Strategic Plan 2022-2027
  • Message from the Board Chair
  • Message from the Head of School
  • School Board
  • Our 65 Year Journey
    • Advancing a Legacy of Excellence
  • Our School Structure
    • Organisational Structure
    • Primary School
    • Secondary School
    • Projects Undertaken During 2022/23
    • Leadership Team
  • Our Students
    • Our Learning Process and Academic Performance
    • Co-Curricular Activities
    • Experiential Learning
    • Service to the Community and the Environment
    • Learning with Technology
    • Noteworthy Events of the Year
  • DEIJB
    • What Does DEIJB Mean to OSC?
  • Our Teachers
    • Our Faculty
    • Our Teacher Standards
    • Continuous Professional Development (CPD)
  • Our Parents
    • Parents as Partners
    • Networking Opportunities
  • Financial Statements
    • The Report of the Directors
    • Report from the Finance Committee 2022/23
    • Independent Auditor’s Report
    • Statement of Financial Position
    • Statement of Comprehensive Income
    • Statement of Changes in Equity
    • Statement of Cash Flows
    • Notes to the Financial Statements
  • Notice of Annual General Meeting
  • Form of Proxy - Annual General Meeting
  • Corporate Information

Our School Structure

Projects Undertaken During 2022/23

Content to be Exposed Content to be Exposed

Content to be Exposed Content to be Exposed

Print this Page
Add to My Report
Download PDF Format
Download Centre
My Report
Image of Access Control System

1. Access Control System

To enhance the security of our students and staff, an access control system was installed on all doors in the School, including classrooms, offices, storerooms and common areas such as the canteen, auditorium, and library, etc. The system limits access to relevant individuals depending on the room, facilities, and intended use. This upgrade was completed at the end of January 2023.

Image of Turnstile Gates

2. Turnstile Gates

At the end of January, we commissioned the building of three new main entrances to the School that will function in addition to the main perimeter gates. To maintain the safety of the School, only permitted individuals will be allowed through the gates.

Image of Senior Playground

3. Expansion of the Senior Playground

The senior playground was expanded to reach the M Block, opening up a large area that can be used for PE and other outdoor activities. Completed at the end of August 2023, the project was handled by an experienced curator with global experience.

Image of Internal School Driveway

4. Sustainable Internal School Driveway

Since our internal asphalt driveway needed relaying, the School teamed up with AGC Innovate to devise a green solution. The result was Plastic Modified Asphalt Concrete, which incorporates a portion of recyclable plastic into traditional asphalt mixtures.

Image of Ground Drainage System

5. Ground Drainage System

With the addition of the new ground, we installed a subsurface drain network along with concrete perimeter storm water drains to ensure that stormwater is properly and efficiently drained.

Image of Perimeter CCTV

6. Perimeter CCTV

A CCTV system was installed around the entire perimeter of the School to enhance security.

Image of SMPR and PMPR

7. Acoustic Developments in SMPR and PMPR

Both rooms were installed with acoustic panels made of aesthetic and lightweight materials.

Image of Security Building

8. Security Building

A security complex was completed and operated in the first week of January 2023, when the School reopened. This building is fully fitted out with screening equipment, including baggage scanning machines and a CCTV monitoring room, providing a dedicated driveway for student drop off and safe entry to the school premises.

Image of Automatic Sprinkler System

9. Automatic Sprinkler System for the Senior Playground

Watering the grounds is difficult and time consuming; hence we invested in an automatic sprinkler system that was installed along the perimeter of the senior playground. The system was designed to uniformly and efficiently distribute water to every part of the ground, considerably reducing water usage.